Subject: MT"CHEM" VOY 06.22, AT BND STS POSITION TO LOAD AROUND 8 KT CONDENSTAE OF 2ND PARCEL / COMPLETE LOADING From: "RAMYAR" Date: 23/05/2022, 19:51 To: CC: "'Ops.Arsang'" , , Good Day, Please find update report of the vsl at B.Abbas sts position as below: 22.05.2022 2300 hrs lt Nor Tendered 23.05.2022 0048 hrs lt Pon 0130 hrs lt Tug made fast 0200 hrs lt First line 0245 hrs lt Tug caste off 0248 hrs lt All made fast 0254 hrs lt Pilot away 0330/0330 Hose Connected (1x8 inch stbd side) 1025 hrs lt Surveyor on board 1048/1154 Tanks inspection 1154/1218 Calculation 1312 hrs lt Commence loading 2nd parcel 24.05.2022 0518 hrs lt Complete loading 2nd parcel Reverting Best Regards Ramyar (Mr.) Ops Manager Asia Marine Crown Agency (AMC) Apt. 7 , 1st floor, South wing , Bldg. No.21,Kar Va Tejarat St., Vanak Sq,Tehran 1991943845, Iran Tel: +98 21 86 08 04 31 +98 21 86 08 36 90 Cell:+98 912 385 9771 cid:image002.jpg@01D854B8.58C12C00