Subject: MT"CHEM" VOY 1522, AT BND TO DISCHARGE AROUND 7 KT CONDENSTAE / LINE DISPLACEMENT From: "RAMESH " Date: 18/09/2022, 00:58 To: CC: "'Ops.Arsang'" , , Good day, Pls find update report of the vsl at B. Abbas jetty 47 as below: 14.09.2022 1748 hrs lt Eosp-Nor tendered 1818 hrs lt Drop anchor 16.09.2022 1618 hrs lt Anchor aweigh 1800 hrs lt Pob 1806 hrs lt fwd tug made fast 1818 hrs lt Aft tug made fast 1842 hrs lt 1st line ashore 1848 hrs lt All made fast 1848 hrs lt fwd/aft tug cast off 1854 hrs lt Gangway ashore 1854 hrs lt pilot away 1854 hrs lt Surveyor on board 1900/2000 Initial tanks inspection 2030 hrs lt Calculation over 2330 hrs lt hose connected 2342 hrs lt commence discharging for Line displacemnet (1st parcel) 0130 hrs lt Resume discharging 18.09.2022 0306 hrs lt Completed discharging 1st parcel 0306 hrs lt Surveyor on board 0312/0400 Ullaging 0500 hrs lt Calculation over 1030 hrs lt Commence discharging 2nd parcel 1154 hrs lt Line displacement Best Regards Ramesh Aflakian (Mr.) Ops Manager Asia Marine Crown Agency (AMC) Apt. 7 , 1st floor, South wing , Bldg. No.21,Kar Va Tejarat St., Vanak Sq,Tehran 1991943845, Iran Tel: +98 21 86 08 04 31 +98 21 86 08 36 90 Cell:+98 912 385 9771 cid:image002.jpg@01D854B8.58C12C00