Subject: Re: Loading;arrangement;for;MT-VETER From: "saber@cgwshipping.com" Date: 29/09/2022, 20:25 To: 小矿工 <744824644@qq.com> CC: 1446466913 <1446466913@qq.com>, dzs_dd , yuxishippingdd , saharathunder Good morning Sir. Your below message received in order with thanks. Will revert, shortly. Capt. Saber > > On 30 Sep 2022, at 05:56, 小矿工 <744824644@qq.com> wrote: > > > >  > > Dear Sir/Madam > > > > Good day, > > > > According to the previous communication, MT LINGYANG cannot reach the designated position because the information of the mother ship cannot be provided. Therefore, the STS operation cannot be carried out under realistic conditions. > > > > We designated MT VETER to replace MT LINGYANG to carry out the STS operations. Please refer to the Q88 information as attached. > > > > MT VETER tentative ETA STS location is 2200LT 30-SEP-2022 IAGW&WP. Please advise preparation for D.V to be carried out before and after arrival RVP? > > > > Please confirm whether the following information still valid: > > Coding-111-PG: > > # Pilot = Papa-01 > > # Loading Master: Lima-01 > > # M.V= Mike-5 ETA: TBA > > # D.V= Delta-6 ETA: 2200HRS-30-SEP-2022 > > # Cargo: ICO > > # Tug Boat-1: Tango-01 > > # Tug Boat-2: Tango-02 > > # VHF CH.s: 06/15 > > # RV pstn: Lat: 27-30.00 N > > Long: 052- 00.00 E > > # Depth: about 50 m > > > > Please advise M.V get ready for STS operation ASAP. > > > > Thanks and Best regards > > Danny Attachments: 3-3-MT VETER_Q88(1).pdf 200 KB